Energy from Waste in Hampshire
This video tells the story of how the company has managed Hampshire's waste since 1996 through recycling, composting and Energy from Waste.
Chineham
Integra North (Chineham) is capable of processing 90,000 tonnes of waste per year and recovers heat energy from the waste to produce steam.
Marchwood
Operational since December 2004 the Integra South West (Marchwood) can process 165,000 tonnes of waste per year.
Portsmouth
Integra South East (Portsmouth) is the only inner-city facility in Hampshire and has won several design awards.
Landfill
We will always be left with residual waste. Its disposal should be handled with the maximum of care and attention.