Our proposal and consultation documents

Our proposal and consultation documents

Find out more about our proposed rail-linked power station and access the consultation documents here.

As part of the process of developing our proposals for the Fieldes Lock Power Station, Veolia is currently undertaking a wide range of environmental and geo-technical surveys of the site.  Some of these surveys are intrusive and require the use of specialist drilling equipment.  The outcome of these surveys will help determine the detailed design of the power station.  These works do not constitute the start of construction. Construction of the proposed power station cannot commence until planning permission has been applied for and granted.

Phase Two Information Documents

Phase Two Consultation Documents

Phase One Information Documents

Phase One Consultation Documents

FAQs

How can we help?

For further details on how we can help you please contact us on: Call: 08000 329 974 (freephone)
Email: Fieldes Lock team

Publications

Whilst we aim to help protect the environment you can request limited copies of our printed publications here.