Marchwood pic


   
Marchwood

Operational since December 2004 the Integra South West (Marchwood) can process 165,000 tonnes of waste per year, and supply up to 16MWs of electricity to the National Grid – that’s enough for around 22,600 local homes.

The design of Marchwood ERF is unique, in that the entire facility is housed under an aluminium-cladded dome. The dome stands 32 metres high, and the stack is 65 metres tall. The technology within is the same as all the other facilities, but the design was created in consultation with local residents, councils and a team of architects. Marchwood ERF is situated on the Southampton Water estuary, opposite Southampton Docks. The ERF uses the estuary water as part of the cooling process for the steam which is used to power the turbines that generate the electricity.

 

  Site Map Site Map Legal Information Legal information
 
 
  Related Link
Please click here to find out the latest emissions for Marchwood.

ERF Facilities Marchwood ERF

 

Group Site Recycling and Recovery Materials Recovery Integrated Waste Management Energy Recovery Veolia Environmental Services